Wednesday, February 24, 2010

Caterham 7 SV build day 3





Another good saturday afternoon's work at the club. That's the exhaust, fuel system, radiator, heater, cooling system, pedal box and steering column all built up.

The diff is proving problematic, but a phonecall to Caterham this week implies that this is common, and "drifting" - hitting with a large hammer - should sort it out.

That just leaves sorting the diff and the rear suspension before finishing the bodywork and body electrics and starting the tests - watch this space for mores

Monday, February 15, 2010

2010 Caterham 7 SV Build Day 2


The engine and gearbox are in! After 2 afternoons work it feels as if we are on the downslope. With all the front suspension, brakes, engine, clutch, starter motor, gearbox, gear lever and engine electrics all in place it feels as if we're over halfway through.

Next weekend we'll fit the exhaust, radiator, water and heater pipes, propshaft, differential, driveshafts, rear hubs, rear brakes and rear suspension. All that we need to do after that is fit the interior, rollbar, windscreen and the prestart checks, lubrication, brake and clutch fluids. Then it's off to the DVLA to be tested. Keep an eye on the window for further progress.

Monday, February 8, 2010

2010 Caterham 7 SV Build Day 1

Yesterday we started building our new C7 Roadsport. Beautifully painted in Lamborghini Pearl White, it will be fitted with Matte Black cycle wings and finished with a red stripe! We hope to have it finished by early March, so that we can get it registered in time for the new season with a 2010 plate (a "60" plate I think...)

The build is being done in the downstairs window so any passers by can see the progress.


We made good progress, and have mostly finished the front suspension, steering
and brakes. The engine is next - we'll start that next weekend. Watch for more updates on the blog.